The final train over the old formation, and the
connection of the new deviation route.
 


The final train on the old formation to Kingsway station passes the new works at a crawl - 9th July 2000


After the final train has passed the old formation is removed in order to connect the new deviation route - 9th July 2000


New track panels being lifted into position - 9th July 2000


With the old route severed work continues into the late evening to connect the new route.
The first train entered the new line at approx 2240hrs on 9th July 2000


Sandy River No. 24 passes through the new floodgate and onto the new viaduct - 14th July 2000


 No. 24 heading south through the new floodgate. The old severed route can be seen on the right,
whilst the viaduct is in the left background - 14th July 2000